“银亿东城”4号楼施工组织设计文件的编制开题报告

 2021-08-08 19:46:57

1. 研究目的与意义

研究目的:随着建筑行业强烈的市场竞争和我国加入世界贸易组织,建筑工程施工组织设计已经不单是工程投标及建设的技术性文件,而且还是指导工程项目成本控制及实施的经济性文件。

如今,建筑市场依照国际惯例,工程施工的发包和承包实行工程招标投标制和合同管理制,工程的管理实行业主责任制、项目经理责任制和工程建设监理制等。

新制度的实行,使项目管理的模式也相应发生了变化,而工程施工环境和技术环境的变化,使施工组织设计的地位和作用发生了根本性的变化。

剩余内容已隐藏,您需要先支付后才能查看该篇文章全部内容!

2. 国内外研究现状分析

construction organization design is the product of the former soviet economic system. in 60 ~ 70 s of the 20th century, our country's construction enterprises are under the planned economy system, so the construction organization design attention is not enough, then only the construction organization as a technical document, single function, has nothing to do with the whole project management project organization. in the 80 s, with the deepening of market economy, the construction organization design is in constant change their roles, joined the project management in construction organization of some functions, construction organization design from pure technical files change for technical management. with the extensive popularization of project law in china and the development of bidding and tendering work in china, the design of construction organization is not simply a technical organization document. it not only guides the technical implementation of the project, but also makes a lot of articles on quality management, safety management, schedule management, seasonal management, project organization and project coordination. in recent years, some contents about cost reduction and new technology development have been added in the construction organization design.project management is a scheme management method developed in the late 1950s. in 1957, dupont applied this method to equipment maintenance for the first time, which reduced the maintenance downtime from 12 hours to 7 hours. 1958 americans in the polaris missile design, application of fundamental theory of project management, make the design phase of the completion period shorten for two years, and then the concept of project management into the people's highly attention. at present, the western prosperous country has formed a scientific system with a perfect analogy in engineering project management.with the sustained and rapid development of our economy and our country building department and the state development planning commission, economic and trade commission to come as soon as possible on the further engineering general contracting and project management guidance "and" project management (help) method ", to develop the engineering general contracting and project management (help) enforcement rules, standard its basic approach, to further promote the scientific, standardized and legalized, so as to guide our country engineering general contracting and project management, project progress management level, in line with international practices.the project manager (pm) has become the golden profession in the new century in china, and the certification work of the project manager has begun. to complete the new china in the 21st century, progress in china's industrial competitiveness, it must be analysis and discussion of the current domestic and foreign project guanwen scientific system of the status quo, to understand and control the international prevailing forms, procedures and specifications, foster strengths and circumvent weaknesses, advancing with the times. this is of great significance for chinese enterprises, especially petrochemical enterprises.1. overview of foreign project management.1.1 the main methods of foreign project management.foreign enterprises of engineering project management mainly include project management contract (project management contractor abbreviated pmc), the project management group (project management team abbreviation for pmt) and construction management (constriction management abbreviated cm), etc.(1) project management contract (pmc)pmc is refers to the project management contractor on behalf of the owner to stop the whole process of engineering project, a full range of project management, including stop the overall project planning, project definition, project bidding, choose the epc (engineering procurement epc is english abbreviation for construction, design, procurement, construction general contracting) the contractor, and stop the process of design, procurement, construction overall management, general is not directly involved in the project design, procurement, construction and commissioning phase of the work in detail. the cost of pmc is calculated according to the "time fee profit reward".the pmc is an extension of the proprietor's organization, from the definition stage to the overall planning and implementation of the whole process, to the owner, and to the owner's purpose and interests.for large projects, due to the complexity of project organization compare, technology, management difficult match, needs the overall harmonic job match, owners often choose the pmc contractor to stop the project management contract. as a pmc contractor, pay more attention to ordinary experience based on itself, to the wrist of the operation of the system and organization: the owner first please a considerable strength of the international engineering companies to stop the comprehensive project management contract; second, to stop the project dividend, the first stage is called the definition phase, and the second stage is called the execution stage. in project definition phase, pmc's mission is to stop management on behalf of the owner of the project early stage, namely to stop the various project program management, program management), for example, effectively completed the early stage of the project (phase glycoprotein fel) preparation; assist owners to obtain project financing; stop the management of the technical source, and stop the integration of the technology of each installation; the various contractors and suppliers involved in the project have stopped management (especially interface harmony and management) to ensure the divergence and interactivity of project contracting. in execution phase performed by the general contractor for detailed design, procurement and establish work, pmc in this stage, on behalf of the owner as a harmonic of the total project management and supervision role until project completion. in both phases, pmc reports to the owner timely, and the owner sends a small number of personnel to stop the monitoring and inspection of pmc's work, and tries to minimize the total cost of the project in the whole life cycle.施工组织设计是前苏联经济体制下的产物。

在20世纪60~70年代,我国各施工企业均为计划经济体制下企业,所以对施工组织设计重视不够,当时只将施工组织作为一本技术性文件,职能单一,与整个项目管理项目组织无关。

在进入80年代,随着市场经济的深入,施工组织设计也在不断地改变自己的角色,在施工组织中加入了项目管理的一些职能,施工组织设计由原来的纯技术性文件改变为技术管理性文件。

剩余内容已隐藏,您需要先支付后才能查看该篇文章全部内容!

3. 研究的基本内容与计划

研究内容: ①认真研究技术标准。

②对建设地区的自然条件及技术经济条件进行调查③编制工程概况④编制施工方案a施工流程及各分部工程施工程序.b各分部(分项)工程的施工方法(与报价有关的分部分项的施工方法是重点).c施工机械的选择..⑤编制进度计划及资源需求量计划⑥编制施工现场平面图⑦制定技术经济指标和保证质量安全的措施研究计划1.2017年12月31日-2018年02月26日:选定毕业设计题目(方向)即银亿东城4号楼施工组织设计文件的编制2.2018年02月29日-2016年03月10日:毕业实习,确定题目并搜集设计所需资料,编制完成开题报告3.2018年04月04日-2016年05月06日:撰写完成毕业设计初稿;4.2018年05月09日-2018年05月27日:修订毕业设计初稿,完成终稿;5.2018年05月30日-2018年06月04日:打印装订毕业设计,交老师评阅;6.2018年06月06日-2018年06月18日:老师评阅毕业设计,学生准备答辩;完成毕业答辩

4. 研究创新点

特色:工程招标的工程量清单根据招标项目具体特点和实际需要编制,并与投标人须知、通用合同条款、专用合同条款、技术标准与要求、图纸等内容相衔接。

创新:过去,施工组织设计是按技术需要编制的,其主要内容仅限于工程概况、施工方案、施工进度计划、施工平面布置图、保证施工质量及安全的技术和组织措施。

在市场经济体制下,施工组织设计作为工程承包合同的一部分,其内容不仅要考虑技术上的需要,更要考虑履行合同的需要,应编成一份集技术、经济、管理、合同于一体的项目管理规划性文件、合同履行的指导性文件、工程结算和索赔的依据性文件,因此,施工组织设计的内容应增加,应向项目管理规划方向发展。